This project is the first to build, measure and optimise a recyclable asphalt collector for the regeneration of geothermal probes.
The background to this pilot and demonstration project is the increasingly dense use of geothermal probes, which leads to long-term cooling of the subsoil. Studies show that there is a considerable need for…
...
This project is the first to build, measure and optimise a recyclable asphalt collector for the regeneration of geothermal probes.
The background to this pilot and demonstration project is the increasingly dense use of geothermal probes, which leads to long-term cooling of the subsoil. Studies show that there is a considerable need...